Fig. 6
From: Towards real-time probabilistic ash deposition forecasting for New Zealand

LHS draw with 30 points used in the operational case study corresponding to 30 eruption scenarios. From top to bottom: mass eruption rate (MER), eruption column height above vent (H), and eruption duration (D)